LPA – Retrofit in Ireland Spa Distribution Centre, LPA pumps adjacent liquid receiver.

Pictured above LPA 875-BR-044-B in position awaiting the LPA retrofit receiver pipe work with bottom outlets ideal for ensuring a good supply of liquid refrigerant into the LPA® at low condensing pressures and higher efficiency. An LPA retrofit can typically take on average 2 to 3 working days to complete per circuit.